
Redeveloping East Broad Street: Heck Chapel, the Old Courthouse, and the Lots Between
I helped write the Griffin DDA's request for proposals for four properties on East Broad Street, including Heck Chapel and Spalding County's original 1860 courthouse. Proposals are due December 7, 2026.
On October 19, 2026, the Griffin Downtown Development Authority released a request for proposals for the north side of one downtown block on East Broad Street. The DDA owns everything on that side of the block: Heck Chapel at one corner, the original Spalding County Courthouse at the other, and two vacant lots between them. We’re looking for a developer who’ll treat both buildings with the respect they’re owed and make the block busy again.
As vice-chair of the DDA, I helped put the whole package together. Our board chair and I led the drafting, working with City of Griffin Economic Development. I helped write the RFP and its scoring rubric, built the RFP website, pulled the document library together, and wrote the historical briefings on both buildings.
Proposals are due December 7, 2026 at 4:00 PM. Everything a bidder needs, from the RFP to the environmental reports, is on the Griffin DDA’s RFP page.
Two buildings that carried a lot of Griffin’s history share one block. This RFP is our shot at giving them a future.
Project Overview
| Project Parameter | Details |
|---|---|
| Owner and Issuer | City of Griffin Downtown Development Authority |
| My Role | Vice-chair and RFP co-author |
| Location | North side of the block on East Broad Street, downtown Griffin |
| Properties | Four adjacent properties, five parcels |
| RFP Released | October 19, 2026 |
| Mandatory Pre-Proposal Meeting | November 4, 2026, 2:00 PM, Historic City Hall |
| Proposals Due | December 7, 2026, 4:00 PM |
| Sale Terms | As is, closing within 60 days of a binding agreement |
| Build Window | Start within 12 months and finish within 30 months of closing |
The Block
Picture one downtown block. Historic City Hall sits at the southwest corner. The City renovated it about ten years ago. A new Courtyard by Marriott is planned for the southeast corner, with groundbreaking targeted for summer 2027.
The north side, along East Broad Street, is the part we’re putting out for bid. Heck Chapel sits at the northwest corner. The Historic Courthouse/Jail sits at the northeast corner, where East Broad meets North 5th Street. Two vacant lots fill the space between them.

With a hotel on the way, this block is going to get a lot more foot traffic. We want the north side to be ready for it: active uses, open to the public, and good for people walking between buildings. That could be commercial, retail, residential, or something we haven’t thought of.
The Properties
All acreage is approximate.
| Property | Parcel ID | Acreage | What We’re Hoping For |
|---|---|---|---|
| Heck Chapel | 014 35001 | 0.25 ac | Adaptive reuse that honors the site’s cultural history |
| Vacant lot | 014 35002, 014 35002A | 0.21 ac, 0.06 ac | Flexible site for hospitality, retail, or residential |
| Vacant lot | 014 35003 | 0.13 ac | Flexible site for hospitality, retail, or residential |
| Historic Courthouse/Jail | 014 35005 | 0.48 ac | Mixed-use redevelopment that keeps its character |
A developer can bid on one property, several, or all of them.
The City of Griffin is also working to buy the parcel with the block building next to the jail (014 35004) for public parking. A project this size will need parking, and that lot can be combined with the neighboring vacant lot if a developer needs more.
Heck Chapel

Heck Chapel holds a big piece of Griffin’s Black history.
Before Emancipation, enslaved African Americans in Griffin were only allowed to worship from the balcony of First Baptist Church. In 1864, near the end of the Civil War, freedmen set up their own sanctuary at 202 East Broad Street. The church became the “mother church” of the African American Methodist congregations in Griffin, and the Gothic Revival building that stands there now dates to 1880.
In the 1950s and 1960s, under Rev. James Maynard Shopshire, Heck Chapel was a center of the Civil Rights Movement in Spalding County. Rev. Shopshire founded the Griffin-Spalding branch of the NAACP there. The sanctuary hosted nonviolent protest training, youth leadership workshops, and voter registration drives.
Services ended around 2000, after more than 135 years. The DDA bought the building to stop the blight and to give it a future. It isn’t on the National Register. I wrote the historical briefing on Heck Chapel so every bidder knows what happened inside those walls before they draw a single floor plan.
The Historic Courthouse and Jail

The building at 232 East Broad Street was Spalding County’s first courthouse. It was built in 1860 in the Italianate style, designed by New York architect Columbus Hughes and built by David Demarest for $12,000. It’s one of only 15 antebellum courthouses still standing in Georgia, and it’s been on the National Register of Historic Places since 2000.
It served as the courthouse for about 50 years. After the county built a new courthouse in 1911, this one became the county jail in 1914. The original clock and bell tower came down in the conversion. The new cell blocks came from the Pauley Jail Works Company of St. Louis, and newspapers at the time called it the “most modern jail in the state.” It stayed a jail until 1984, with the sheriff’s family living on site.

Those two-story steel cells are still there. Film and TV crews have used the building for The Walking Dead, MacGyver, and Rectify. I’d love to see a developer build around the cells and not tear them out. An event space, a creative office, a brewery, or a cultural center could all work.
Because it’s on the National Register, a project here can qualify for federal and state historic tax credits. I wrote about how those work in historic preservation tax credits and how Georgia boards use them.
What We’re Asking Developers For
The RFP asks each team to tell us:
- which properties they want, and their proposed purchase price for each
- who’s on the team, and what similar projects they’ve finished
- the proposed uses, with drawings, renderings, and a site plan
- a realistic schedule with milestones
- a detailed budget, how it’s funded, and proof they can finish on time
- how the project fits with Historic City Hall and the new hotel
- how it improves life for people in Griffin
- any help they’d need from the City, the DDA, the Urban Redevelopment Authority, DCA, or anyone else
We also ask every team to read the environmental and structural reports for both buildings before they price anything. Old buildings hide surprises, and we’d rather a developer find them on paper than in the middle of construction.
How Proposals Are Scored
| Category | Points |
|---|---|
| Historic and Cultural Preservation | 20 |
| Financial Capacity, Budget, and TAD Alignment | 25 |
| Project Timeline and Construction Readiness | 20 |
| Architectural Compatibility and Site Context | 15 |
| Team Qualifications and Technical Feasibility | 10 |
| Quality of Life and Community Benefit | 10 |
| Total | 100 |
When we built the rubric, we gave financial capacity the most weight on purpose. A beautiful concept doesn’t help anyone if the team can’t pay for it. Historic preservation and construction readiness come next, at 20 points each, because we don’t want a plan that saves the buildings on paper and never breaks ground. The DDA is funded through Griffin’s Tax Allocation District, so a project also has to fit the TAD’s rules and grow the downtown tax base. If you want the long version of why TADs are such a big deal for downtowns, I covered it in why a Tax Allocation District is the ultimate funding engine for downtown revitalization.
The Money
The DDA would like to sell these properties for close to what we paid for them. The point is to get the right project built.
We also know a project like this may need some public/private participation. The parking parcel is one example, and the RFP says the DDA will consider other kinds of help if a proposal spells them out. I wrote about how those deals get structured in structuring public-private partnerships for Georgia downtown projects.
Developers can also look at these programs:
- Local: the DDA Facade Grant and General Business Assistance Grant (up to $10,000 each), and the Downtown Catalyst Flex Grant (up to 10% of a qualifying project)
- State: the Downtown Development Revolving Loan Fund, DCA’s Redevelopment Fund, and Georgia Cities loan programs, including SSBCI
- Federal: the 20% Federal Historic Tax Credit, the New Markets Tax Credit Program, and Opportunity Zone incentives
Each program has its own rules, so check with the administering organization before counting on any of them.
Key Dates
| Date | What Happens |
|---|---|
| Oct. 19, 2026 | RFP released |
| Oct. 19 – Nov. 4, 2026 | Register that you have a copy of the RFP |
| Nov. 4, 2026 | Mandatory pre-proposal meeting, 2:00 PM, followed by building access 3:00 – 5:00 PM |
| Nov. 9, 16, and 23, 2026 | Extra site tours, 1:00 – 5:00 PM (call ahead) |
| Nov. 12, 2026 | Deadline for questions |
| Dec. 7, 2026 | Proposals due, 4:00 PM |
| Dec. 8, 2026 | Proposals opened in public at the DDA meeting |
| Dec. 8, 2026 – Jan. 5, 2027 | Proposal evaluation |
| Jan. 12, 2027 | DDA considers developers or meets with a short list |
The pre-proposal meeting is mandatory, and everyone touring the buildings has to sign a liability waiver.
What I Worked On
An RFP like this is a lot more than one PDF. Here’s what I helped build:
- The RFP itself. Our board chair and I led the drafting, working with City of Griffin Economic Development.
- The scoring rubric. Six categories and 100 points, so every proposal gets judged the same way and the public can see how we’ll decide.
- The RFP website. I built the RFP page on griffindda.com so the dates, documents, incentives, and photo sets all live in one place.
- The document library. Environmental and structural reports, the lot plat, the historic district map, and photo sets, organized by building.
- The historical briefings. I wrote the briefings on Heck Chapel and the Old Spalding County Courthouse and Jail.
City of Griffin Economic Development is handling registrations, questions, and site tours, and the full DDA board released the RFP.
Documents and Contact
Everything is on the Griffin DDA’s RFP page, including:
- the full RFP and the RFP brochure
- the Heck Chapel historical briefing and the Old County Jail historical briefing
- environmental and structural reports for both buildings, plus photo sets of the block
To register, ask questions, or schedule a tour, contact Jeremy Stratton at City of Griffin Economic Development, 201 East Solomon St., Griffin, GA 30223, at (770) 228-5356 or jstratton@cityofgriffin.com.
What It Could Mean for Griffin
Downtowns don’t get many chances like this. Two historic buildings, the land between them, and a new hotel going up next door, all on one block that the DDA already owns. If the right team takes it on, East Broad Street goes from a stretch people drive past to a place people go.
I’ve written before that small downtowns need a pipeline of real redevelopment sites, not just a vision plan. This block is what that looks like: land under public control, documents ready, and a clear set of rules for how we’ll choose. Now we need the right proposal.
